At the close of the fiscal year 2022, net production in Spain amounted to 56,698 GWh, while installed capacity in Spain stood at 29,013 MW.
Also, we have 11.34 million points of managed electricity supply, while the energy distributed reached 68,462 GWh, in line with the previous year.
Data on production and installed capacity of the Iberdrola group in Spain in Fiscal Year 2022
Key figures
2022 | 2021 | vs 2021 | ||
Net production | GWh | 56,698 | 60,967 | -7.0% |
Nuclear | GWh | 23,886 | 23,193 | 3.0% |
Gas Combined Cycles | GWh | 7,082 | 7,023 | 0.8% |
Cogeneration | GWh | 1,904 | 2,331 | -18.3% |
Renewables | GWh | 23,826 | 28,420 | -16.2% |
Installed capacity | MW | 29,013 | 28,427 | 2.1% |
Nuclear | MW | 3,177 | 3,177 | 0 |
Gas Combined Cycles | MW | 5,695 | 5,695 | 0 |
Cogeneration | MW | 347 | 347 | 0 |
Renewables* | MW | 19,796 | 19,210 | 3.1% |
Distributed Electricity | GWh | 89,622 | 90,933 | -1.4% |
Gas Supplies | GWh | 30,921 | 32,911 | -6.0% |
Consumers | GWh | 15,258 | 17,138 | -11.0% |
Gas Combined Cycles | GWh | 15,663 | 15,774 | -0.7% |
Electricity Users (managed supply points) | No (mill.) | 11.36 | 11.28 | 0.7% |
Electricity customers | No (mill.) | 10.88 | 10.76 | 1.1% |
Gas customers | No (mill.) | 1.35 | 1.44 | -6.0 % |
(*) Includes 998 MW of hydroelectric capacity installed in Portugal.
Network business
At the end of 2022, the networks business in Spain had 11.4 million supply points, while distributed energy totalled 89,622 GWh, down 1.4% compared to the end of 2021.
i-DE launched the European project BeFlexible in 2022, with the aim of tackling the challenge of accelerating the Energy Transition and meeting the objectives of the Green Deal. The project has received funding of EUR 10 million from the European Commission through the Horizon Europe programme and has a duration of four years.
More information on i-DE (spanish version)
Electricity production and customers business
At year end, Iberdrola had an installed renewable capacity in Spain of 19,796 MW (+3.1%).
Changes in production consolidated at EBITDA level by technology were as follows with respect to 2021:
- Onshore wind production totalled 11,254 GWh, down 2.1%, mainly due to the lower wind resource that period.
- Hydroelectric production stood at 9,511 GWh, down 34.9% due to lower rainfall during the year.
- Solar photovoltaic production totalled 2,150 GWh, up 74.4% as a result of the commissioning of new capacity.