Iberdrola España, leader in renewable energy in Spain

Four people are sitting at a table during an agreement signing. From left to right, a smiling woman in a light sweater, a man with glasses and a green tie signing a document, a man in a green shirt with a laptop in front of him, and a man in a dark suit also signing. They are in a room with a background displaying the University of Córdoba logos and the Invest initiative on a mural.
23/02/2026
The agreement, with an initial term of two years, guarantees the supply of 33 GWh.
Aerial view of an electric vehicle charging station by Iberdrola and BP Pulse. Several charging stations are lined up, with the logos of both companies visible on the roof of each station. In the background, there is a rural landscape with fields and mountains in the distance. The area is clear and well-organized, with parking spaces for electric vehicles.
A group of people, all wearing safety helmets and reflective vests, are gathered around a vehicle. One man is using a tablet to interact with the information on the vehicle, while the others are observing. In the background, a yellow and green helicopter is parked. The group appears to be engaged in a training or inspection activity in an industrial setting.
Conference room with an audience attending a presentation. On stage, three men are taking part in a panel discussion: two seated at a table and one standing while addressing the audience. The projected screen reads “XXIII Encuentro” alongside the i-DE Grupo Iberdrola logo and an image related to power networks. The room features modern decor and green wall panels.

Services and Products in Spain

Our Business

Top stories

Reservoirs play a key role in water management in Spain

Find out how reservoirs promote sustainable water use and help mitigate the effects of of droughts and floods in Spanish river basins.

Plan il·lumina: the electrical redesign of the areas affected by the 2024 flash floods in Spain

We are building the electricity grid of the future in the areas impacted by last October’s floods: a more robust, resilient and digital distribution network. Learn about the Plan il·lumina.

Access