News
28/07/2026

A 34-ton turbine runner from a pumped-storage hydroelectric power plant, donated by Iberdrola España, is installed on one of the new roundabouts on Cáceres' Southern Ring Road

  • The five-meter-diameter component could move 4.9 million litres of water per minute and was in service for almost six decades
  • It showcases engineering excellence and highlights the importance of hydroelectric generation and energy storage in the Tagus River basin in the province of Cáceres 
Five people posing next to a renewable energy installation in an outdoor industrial area.

One of the new roundabouts on the Ronda Sur in Cáceres, Extremadura